关键词不能为空

当前您在: 主页 > 英语 >

汽车中英文缩写

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2020-11-05 03:57
tags:班车英文

王后英文-色度单位

2020年11月5日发(作者:白生祥)


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
汽车中英文缩写
作者:英语协会宣传部发布日期:2008-11-17
Abbreviations 中文解释 Descriptions
DES 设计中心 Design Center
ENG 工程技术、工程学 Engineering
FIN 金融的 Financial
MFG 制造过程 Manufacturing Operations
MKT 营销 Marketing
MNG 制造工程 Manufacturing Engineering
PCL 生产控制和支持 Production Control and Logistics
PER 人员 Personnel
PGM 项目管理 Program Management
PUR 采购 Purchasing
QUA 质量 Quality
Acronyms Descriptions
4 VDP 四阶段的汽车发展过程 Four Phase Vehicle Development
Process
ADV 分析发展验证 AnalysisDevelopmentValidation
AA 审批体系 Approve Architecture
ABS 防抱死制动系统 Anti-lock Braking System
ACD 实际完成日期 Actual Completion Date
AI 人工智能 Artificial Intelligence
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
AIAG 汽车工业产业群 Automotive Industry Action Group
ALBS 装配线平衡系统 Assembly Line Balance System
AP 提前采购 Advanced Purchasing
API 先进的产品信息 Advanced Product Information
APM 汽车加工模型 Automotive Process Model
APQP 先进的产品质量计划 Advanced Product Quality Planning
AR 拨款申请 Appropriation Request
ARP 拨款申请过程 Appropriation Request Process
ARR 建筑必要性检查 Architectural Requirements Review
ASA 船运最初协议 Agreement to Ship Alpha
ASB 船运第二个协议 Agreement to Ship Beta
ASI 建筑研究启动 Architecture Studies Initiation
ASP 船运标准协议 Agreement to Ship Prototype
ASR 建筑选择审查 Architecture Selection Review
B-I-S 最佳分节段 Best-In-Segment
BCC 品牌特征中心 Brand Character Center
BEC 基础设计内容 Base Engineered Content
BI 开始冒气泡 Bubble Up Initiation
BIW 白车身 Body In White
BOD 设计清单 Bill of Design
BOM 原料清单 Bill of Material
BOP 过程清单 Bill of Process
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
CAD 计算机辅助设计 Computer-Aided Design
CAE 计算机辅助工程(软件) Computer-Aided Engineering
CAF? 公司的平均燃油经济 Corporate Average Fuel Economy
CAM 计算机辅助制造 Computer-Aided Manufacturing
CAMIP 持续汽车市场信息项目 Continuous Automotive Marketing
Information Program
CARE 用户接受度审查和评估 Customer Acceptance Review and
Evaluation
CAS 概念可改变的选择 Concept Alternative Selection
CDD 成分数据图 Component Datum Drawings
CGS 公司图形系统 Corporate Graphic System
CI 提出概念 Concept Initiation
CIT 隔间融合为组 Compartment Integration Team
CKD 完全拆缷 Complete Knockdown
CMM 坐标测量仪 Coordinate Measuring Machines
CMOP 结构管理工作计划 Configuration Management Operating Plan
CPP 关键途径 Corporate Product PorefolioCritical Path Plan
CR&W 控制机器人技术和焊接 ControlsRobotics & Welding
CRIT 中心新产品展示执行组 Center Rollout Implementation Team
CS 合同签订 Contract Signing
CTS 零件技术规格 Component Technical Specification
DEC 设计工程学会 Design and Engineering Council
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
DAP 设计分析过程 Design Analysis Process
DCAR 设计中心工作申请 Design Center Action Request
DDP 决策讨论步骤 Decision Dialog Process
DFA 装配设计 Design for Assembly
DFM 装配设计 Design For Manufacturability
DLT 设计领导技术 Design leader Technical
DMA 经销商市场协会 Dealer Market Association
DMG 模具管理小组 Die Management Group
DOE 试验设计 Design Of Experiments
DOL 冲模业务排行 Die Operation Line-Up
DQV 设计质量验证 Design Quality Verification
DRE 设计发布工程师 Design Release Engineer
DSC 决策支持中心 Decision Support Center
DVM 三维变化管理 Dimensional Variation Management
DVT 动态汽车实验 Dynamic Vehicle Test
EM 进化的 EvolutionaryMajor
EAR 工程行为要求 Engineering Action Request
ECD 计划完成日期 Estimated Completion Date
EGM 工程组经理 Engineering Group Manager
ELPO 电极底漆 Electrode position Primer
EOA 停止加速 End of Acceleration
EPC&L 工程生产控制和后勤 Engineering Production Cntrol
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
&Logistics
ETSD 对外的技术说明图 Exterior Technical Specification
Drawing
EWO 工程工作次序 Engineering Work Order
FA 最终认可 Final Approval
FE 功能评估 Functional Evaluation
FEDR 功能评估部署报告 Functional Evaluation Disposition
Report
FFF 自由形态制造 Free Form Fabrication
FMEA 失效形式及结果分析 Failure Mode and Effects Analysis
FTP 文件传送协议 File Transfer Protocol
GA 总装 General Assembly
GD&T 几何尺寸及精度 Geometric Dimensioning & Tolerancing
GM 通用汽车 General Motors
GME 通用汽车欧洲 General Motors Europe
GMIO 通用汽车国际运作 General Motors International Operations
GMIQ 通用汽车初始质量 General Motors Initial Quality
GMPTG 通用汽车动力组 General Motors Powertrain Group
GP 通用程序 General Procedure
GSB 全球战略部 Global Strategy Board
HVAC 加热、通风及空调 Heating, Ventilation ,and Air
Conditioning
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
IP 仪表板 Instrument Panel
IC 初始租约 Initiate Charter
ICD 界面控制文件 Interface Control Document
IE 工业工程 Industrial Engineering
IEMA 国际出口市场分析 International Export Market Analysis
ILRS 间接劳动报告系统 Indirect Labor Reporting System
IO 国际业务 International Operations
IPC 国际产品中心 International Product Center
IPTV 每千辆车的故障率 Incidents Per Thousand Vehicles
IQS 初始质量调查 Initial Quality Survey
IR 事故报告 Incident Report
ISP 综合计划 Integrated Scheduling Project
ITP 综合培训方法 Integrated Training Process
ITSD 内部技术规范图 Interior Technical Specification Drawing
IUVA 国际统一车辆审核 International Uniform Vehicle Audit
KCC 关键控制特性 Key Control Characteristics
KCDS 关键特性标识系统 Key Characteristics Designation System
KPC 关键产品特性 Key product Characteristic
LLPR Ling Lead P Release
MDD 成熟的数据图 Master Datum Drawings
MFD 金属预制件区 Metal Fabrication Division
MIC 市场信息中心 Marketing Information Center
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
MIE 制造综合工程师 Manufacturing Integration Engineer
MLBS 物化劳动平衡系统 Material Labor Balance System
MMSTS 制造重要子系统技术说明书 Manufacturing Major Subsystem
Technical Specifications
MPG 试验场 Milford Proving Ground
MPI 主程序索引 Master Process Index
MPL 主零件列表 Master Parts List
MPS 原料计划系统 Material Planning System
MRD 物料需求日期 Material Required Date
MSDS Material Safery Data Sheets
MSE 制造系统工程 Manufacturing System Engineer
MSS 市场分割规范 Market Segment Specification
MTBF 平均故障时间 Mean Time Between Failures
MTS 生产技术规范 Manufacturing Technical Specification
MVSS 汽车发动机安全标准 Motor Vehicle Safety Standards
NAMA 北美市场分析 North American Market Analysis
NAO 北美业务 North American Operations
NAOC NAO货柜运输 NAO Containerization
NC 用数字控制 Numerically Controlled
NGMBP 新一代基于数学的方法 Next Generation Math-Based Process
NOA 授权书 Notice of Authorization
NSB 北美业务部 NAO Strategy Board
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
OED 组织和员工发展 Organization and Employee Development
PA 生产结果 Production Achievement
PAA 产品行动授权 Production Action Authorization
PAC 绩效评估委员会 Performance Assessment Committee
PACE 项目评估和控制条件 Program Assessment and Control
Environment
PAD 产品装配文件 Product Assembly Document
PARTS 零件准备跟踪系统 Part Readiness Tracking System
PC 问题信息 Problem Communication
PDC 证券发展中心 Portfolio Development Center
PDM 产品资料管理 Product Data Management
PDS 产品说明系统 Product Description System
PDT 产品发展小组 Product Development Team
PED 产品工程部 Production Engineering Department
PEP 产品评估程序 Product Evaluation Program
PET 项目执行小组 Program Execution Team
PIMREP 事故方案跟踪和解决过程 Project Incident Monitoring and
Resolution Process
PLP 生产启动程序 Production Launch Process
PMI 加工建模一体化 Process Modeling Integration
PMM 项目制造经理 Program Manufacturing Manager
PMR 产品制造能要求 Product Manufacturability Requirements
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
PMT 产品车管理小组 Product Management Team
POMS 产品指令管理小组 Production Order Management System
POP 采购点 Point of Purchase
PPAP 生产零部件批准程序 Production Part Approval Process
PPH 百分之 Problems Per Hundred
PPM 百万分之 Problems Per Million
PR 绩效评估 Performance Review
PRR 问题报告和解决 Problem Reporting and Resolution
PSC 部长职务策略委员会 Portfolio Strategy Council
PTO 第一次试验 Primary Tryout
PVM 可设计的汽车模型 Programmable Vehicle Model
PVT 生产汽车发展 Production Vehicle Development
QAP 质量评估过程 Quality Assessment Process
QBC 质量体系构建关系 Quality Build Concern
QC 质量特性 Quality Characteristic
QFD 质量功能配置 Quality Function Deployment
QRD 质量、可靠性和耐久力 Quality, Reliability,andDurability
QS 质量体系 Quality System
RC 评估特许 Review Charter
RCD 必须完成日期 Required Completion Date
RFQ 报价请求 Request For Quotation
RONA 净资产评估 Return on Net Assets
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
RPO 正式产品选项 Regular Production Option
RQA 程序安排质量评定 Routing Quality Assessment
RT&TM 严格跟踪和全程管理 Rigorous Tracking and Throughout
Managment
SDC 战略决策中心 Strategic Decision Center
SF 造型冻结 Styling Freeze
SIU 电子求和结束 Summing It All Up
SL 系统规划 System Layouts
SMBP 理论同步过程 Synchronous Math-Based Process
SMT 系统管理小组 Systems Management Team
SOP 生产启动 Start of Production
SOR 要求陈述 Statement of Requirements
SOW 工作说明 Statement of Work
SPE 表面及原型工程 Surface and Prototype Engineering
SPO 配件组织 Service Parts Operations
SPT 专一任务小组 Single Point Team
SQC 供方质量控制 Statistical Quality Control
SQIP 供应商质量改进程序 Supplier Quality Improvement Process
SSF 开始系统供应 Start of System Fill
SSLT 子系统领导组 Subsystem Leadership Team
SSTS 技术参数子系统 Subsystem Technical Specification
STO 二级试验 Secondary Tryout
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
SUW 标准工作单位 Standard Unit of Work
TAG 定时分析组 Timing Analysis Group
TBD 下决定 To Be Determined
TCS 牵引控制系统 Traction Control System
TDMF 文本数据管理设备 Text Data Management Facility
TIMS 试验事件管理系统 Test Incident Management System
TIR 试验事件报告 Test Incident Report
TMIE 总的制造综合工程 Total Manufacturing Integration
Engineer
TOE 总的物主体验 Total Ownership Experience
TSM 贸易研究方法 Trade Study Methodology
TVDE 整车外型尺寸工程师 Total Vehicle Dimensional Engineer
TVIE 整车综合工程师 Total Vehicle Integration Engineer
TWS 轮胎和车轮系统 Tire and Wheel System
UAW 班组 United Auto Workers
UCL 统一的标准表 Uniform Criteria List
UDR 未经核对的资料发布 Unverified Data Release
UPC 统一零件分级 Uniform Parts Classification
VAPIR 汽车发展综合评审小组 Vehicle & Progress Integration
Review Team
VASTD 汽车数据标准时间数据 Vehicle Assembly Standard Time
Data
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the timetables outstanding issues, obviously worked,of the year. The County's departments at all levels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever- higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve rom sewage treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
VCD 汽车首席设计师 Vehicle Chief Designer
VCE 汽车总工程师 Vehicle Chief Engineer
VCRI 确认交叉引用索引 Validation Cross-Reference Index
VDP 汽车发展过程 Vehicle Development Process
VDPP 汽车发展生产过程 Vehicle Development Production Process
VDR 核实数据发布 Verified Data Release
VDS 汽车描述概要 Vehicle Description Summary
VDT 汽车发展组 Vehicle Development Team
VDTO 汽车发展技术工作 Vehicle Development Technical
Operations
VEC 汽车工程中心 Vehicle Engineering Center
VIE 汽车综合工程师 Vehicle Integration Engineer
VIS 汽车信息系统 Vehicle Information System
VLE 总装线主管 Vehicle Line Executive
VLM 汽车创办经理 Vehicle Launch Manager
VMRR 汽车制造必要条件评审 Vehicle and Manufacturing
Requirements Review
VOC 顾客的意见 Voice of Customer
VOD 设计意见 Voice of Design
VSAS 汽车综合、分析和仿真 Vehicle Synthesis,Analysis,and
Simulation
VSE 汽车系统工程师 Vehicle System Engineer
reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
the village and unauthorisedated


videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the s outstanding issues, obviously worked,of the year. The County's departments at allevels must firmly establish the old and silvern development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well ofng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will quality improved at the county level, up to fives basic objective grasp of pollution control that focus, with the focus on three things: a good job, ching the County created. Organization backction, the County garbage River, black and odorous River is
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the -stop strategyng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of ndards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve e treatment rate, running accuracy, complianced up the town's support network construction, is focusing on nanotubes home on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to
ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the hird, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to s the deepening water of this year's sNext, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policydetailed cleaning, dredging plan, planning ahead of time cleaning out mud ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
VTS 汽车技术说明书 Vehicle Technical Specification
WBBA 全球基准和商业分析 Worldwide Benchmarking and Business
Analysis
WOT 压制广泛开放 Wide Open Throttle
WWP 全球采购 Worldwide Purchasing


reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation s action planso December 2016 end of Qian, a
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replaceme
implementation braryngineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basi
the village and unauthorisedated
d eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project
ily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non- point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play splitXia Baolong, Secretary of provincial party Committee stressed that while the splits over three years, but nue to catch on, and resolve a split cannot be changed. All localities and departments to
ll included shut stoppe
nt and reconstruction of heav
n sex, and regional flood

沧海君-先斩后奏什么意思


droplet-lost过去式


苍白的英文-引渡条例


常用的等价无穷小-悠久的历史用英语怎么说


置之不理的意思-彤的拼音


叛乱的意思-玛雅历法


interesting-sudden怎么读


毒药英文-evileye



本文更新与2020-11-05 03:57,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/440406.html

汽车中英文缩写的相关文章

  • 爱心与尊严的高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊严高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊重的作文题库

    1.作文关爱与尊重议论文 如果说没有爱就没有教育的话,那么离开了尊重同样也谈不上教育。 因为每一位孩子都渴望得到他人的尊重,尤其是教师的尊重。可是在现实生活中,不时会有

    小学作文
  • 爱心责任100字作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任心的作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文