王后英文-色度单位
videoconference, Secretary of the
provincial Committee of Xia Baolong stressed: this
year is the timetables outstanding issues,
obviously worked,of the year. The County's
departments at all levels must firmly establish
the old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
汽车中英文缩写
作者:英语协会宣传部发布日期:2008-11-17
Abbreviations
中文解释 Descriptions
DES 设计中心 Design Center
ENG 工程技术、工程学 Engineering
FIN 金融的 Financial
MFG 制造过程 Manufacturing Operations
MKT 营销
Marketing
MNG 制造工程 Manufacturing Engineering
PCL 生产控制和支持 Production Control and Logistics
PER 人员 Personnel
PGM 项目管理 Program
Management
PUR 采购 Purchasing
QUA 质量
Quality
Acronyms Descriptions
4 VDP
四阶段的汽车发展过程 Four Phase Vehicle Development
Process
ADV 分析发展验证
AnalysisDevelopmentValidation
AA 审批体系 Approve
Architecture
ABS 防抱死制动系统 Anti-lock Braking
System
ACD 实际完成日期 Actual Completion Date
AI 人工智能 Artificial Intelligence
reatment
of heavily polluting industries. According to
municipal, and municipal government deployment of
seven big heavy pollution industry regulation s
action planso December 2016 end of Qian, all
included shut stopped eliminated of enterprise all
shut stopped eliminated in place; June 30, 2017
Qian, all included place regulation upgrade and
agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
environment access system, promoting industry
access and environmental conditions of access of
enterprises to the Park, industrial park, in
principle, no longer the class on the new project.
Thirdly, promoting replacement and reconstruction
of heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
AIAG 汽车工业产业群 Automotive Industry
Action Group
ALBS 装配线平衡系统 Assembly Line
Balance System
AP 提前采购 Advanced Purchasing
API 先进的产品信息 Advanced Product Information
APM 汽车加工模型 Automotive Process Model
APQP
先进的产品质量计划 Advanced Product Quality Planning
AR
拨款申请 Appropriation Request
ARP 拨款申请过程
Appropriation Request Process
ARR 建筑必要性检查
Architectural Requirements Review
ASA 船运最初协议
Agreement to Ship Alpha
ASB 船运第二个协议 Agreement
to Ship Beta
ASI 建筑研究启动 Architecture Studies
Initiation
ASP 船运标准协议 Agreement to Ship
Prototype
ASR 建筑选择审查 Architecture Selection
Review
B-I-S 最佳分节段 Best-In-Segment
BCC
品牌特征中心 Brand Character Center
BEC 基础设计内容 Base
Engineered Content
BI 开始冒气泡 Bubble Up
Initiation
BIW 白车身 Body In White
BOD 设计清单
Bill of Design
BOM 原料清单 Bill of Material
BOP 过程清单 Bill of Process
reatment of
heavily polluting industries. According to
municipal, and municipal government deployment of
seven big heavy pollution industry regulation s
action planso December 2016 end of Qian, all
included shut stopped eliminated of enterprise all
shut stopped eliminated in place; June 30, 2017
Qian, all included place regulation upgrade and
agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
environment access system, promoting industry
access and environmental conditions of access of
enterprises to the Park, industrial park, in
principle, no longer the class on the new project.
Thirdly, promoting replacement and reconstruction
of heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
CAD 计算机辅助设计 Computer-Aided Design
CAE 计算机辅助工程(软件) Computer-Aided Engineering
CAF? 公司的平均燃油经济 Corporate Average Fuel Economy
CAM 计算机辅助制造 Computer-Aided Manufacturing
CAMIP 持续汽车市场信息项目 Continuous Automotive
Marketing
Information Program
CARE
用户接受度审查和评估 Customer Acceptance Review and
Evaluation
CAS 概念可改变的选择 Concept
Alternative Selection
CDD 成分数据图 Component
Datum Drawings
CGS 公司图形系统 Corporate Graphic
System
CI 提出概念 Concept Initiation
CIT
隔间融合为组 Compartment Integration Team
CKD 完全拆缷
Complete Knockdown
CMM 坐标测量仪 Coordinate
Measuring Machines
CMOP 结构管理工作计划 Configuration
Management Operating Plan
CPP 关键途径 Corporate
Product PorefolioCritical Path Plan
CR&W
控制机器人技术和焊接 ControlsRobotics & Welding
CRIT
中心新产品展示执行组 Center Rollout Implementation Team
CS 合同签订 Contract Signing
CTS 零件技术规格
Component Technical Specification
DEC 设计工程学会
Design and Engineering Council
reatment of
heavily polluting industries. According to
municipal, and municipal government deployment of
seven big heavy pollution industry regulation s
action planso December 2016 end of Qian, all
included shut stopped eliminated of enterprise all
shut stopped eliminated in place; June 30, 2017
Qian, all included place regulation upgrade and
agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
environment access system, promoting industry
access and environmental conditions of access of
enterprises to the Park, industrial park, in
principle, no longer the class on the new project.
Thirdly, promoting replacement and reconstruction
of heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
DAP 设计分析过程 Design Analysis Process
DCAR 设计中心工作申请 Design Center Action Request
DDP 决策讨论步骤 Decision Dialog Process
DFA
装配设计 Design for Assembly
DFM 装配设计 Design For
Manufacturability
DLT 设计领导技术 Design leader
Technical
DMA 经销商市场协会 Dealer Market
Association
DMG 模具管理小组 Die Management Group
DOE 试验设计 Design Of Experiments
DOL 冲模业务排行
Die Operation Line-Up
DQV 设计质量验证 Design
Quality Verification
DRE 设计发布工程师 Design
Release Engineer
DSC 决策支持中心 Decision Support
Center
DVM 三维变化管理 Dimensional Variation
Management
DVT 动态汽车实验 Dynamic Vehicle Test
EM 进化的 EvolutionaryMajor
EAR 工程行为要求
Engineering Action Request
ECD 计划完成日期
Estimated Completion Date
EGM 工程组经理
Engineering Group Manager
ELPO 电极底漆 Electrode
position Primer
EOA 停止加速 End of Acceleration
EPC&L 工程生产控制和后勤 Engineering Production Cntrol
reatment of heavily polluting industries.
According to municipal, and municipal government
deployment of seven big heavy pollution industry
regulation s action planso December 2016 end of
Qian, all included shut stopped eliminated of
enterprise all shut stopped eliminated in place;
June 30, 2017 Qian, all included place regulation
upgrade and agglomeration restructuring of
enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
&Logistics
ETSD 对外的技术说明图
Exterior Technical Specification
Drawing
EWO 工程工作次序 Engineering Work Order
FA 最终认可
Final Approval
FE 功能评估 Functional Evaluation
FEDR 功能评估部署报告 Functional Evaluation
Disposition
Report
FFF 自由形态制造 Free Form
Fabrication
FMEA 失效形式及结果分析 Failure Mode and
Effects Analysis
FTP 文件传送协议 File Transfer
Protocol
GA 总装 General Assembly
GD&T
几何尺寸及精度 Geometric Dimensioning & Tolerancing
GM 通用汽车 General Motors
GME 通用汽车欧洲 General
Motors Europe
GMIO 通用汽车国际运作 General Motors
International Operations
GMIQ 通用汽车初始质量 General
Motors Initial Quality
GMPTG 通用汽车动力组 General
Motors Powertrain Group
GP 通用程序 General
Procedure
GSB 全球战略部 Global Strategy Board
HVAC 加热、通风及空调 Heating, Ventilation ,and Air
Conditioning
reatment of heavily polluting
industries. According to municipal, and municipal
government deployment of seven big heavy pollution
industry regulation s action planso December 2016
end of Qian, all included shut stopped eliminated
of enterprise all shut stopped eliminated in
place; June 30, 2017 Qian, all included place
regulation upgrade and agglomeration restructuring
of enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
IP 仪表板 Instrument Panel
IC
初始租约 Initiate Charter
ICD 界面控制文件 Interface
Control Document
IE 工业工程 Industrial
Engineering
IEMA 国际出口市场分析 International Export
Market Analysis
ILRS 间接劳动报告系统 Indirect Labor
Reporting System
IO 国际业务 International
Operations
IPC 国际产品中心 International Product
Center
IPTV 每千辆车的故障率 Incidents Per Thousand
Vehicles
IQS 初始质量调查 Initial Quality Survey
IR 事故报告 Incident Report
ISP 综合计划
Integrated Scheduling Project
ITP 综合培训方法
Integrated Training Process
ITSD 内部技术规范图
Interior Technical Specification Drawing
IUVA
国际统一车辆审核 International Uniform Vehicle Audit
KCC 关键控制特性 Key Control Characteristics
KCDS 关键特性标识系统 Key Characteristics Designation
System
KPC 关键产品特性 Key product Characteristic
LLPR Ling Lead P Release
MDD 成熟的数据图
Master Datum Drawings
MFD 金属预制件区 Metal
Fabrication Division
MIC 市场信息中心 Marketing
Information Center
reatment of heavily
polluting industries. According to municipal, and
municipal government deployment of seven big heavy
pollution industry regulation s action planso
December 2016 end of Qian, all included shut
stopped eliminated of enterprise all shut stopped
eliminated in place; June 30, 2017 Qian, all
included place regulation upgrade and
agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
environment access system, promoting industry
access and environmental conditions of access of
enterprises to the Park, industrial park, in
principle, no longer the class on the new project.
Thirdly, promoting replacement and reconstruction
of heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
MIE 制造综合工程师 Manufacturing
Integration Engineer
MLBS 物化劳动平衡系统 Material
Labor Balance System
MMSTS 制造重要子系统技术说明书
Manufacturing Major Subsystem
Technical
Specifications
MPG 试验场 Milford Proving Ground
MPI 主程序索引 Master Process Index
MPL 主零件列表
Master Parts List
MPS 原料计划系统 Material Planning
System
MRD 物料需求日期 Material Required Date
MSDS Material Safery Data Sheets
MSE
制造系统工程 Manufacturing System Engineer
MSS
市场分割规范 Market Segment Specification
MTBF
平均故障时间 Mean Time Between Failures
MTS 生产技术规范
Manufacturing Technical Specification
MVSS
汽车发动机安全标准 Motor Vehicle Safety Standards
NAMA
北美市场分析 North American Market Analysis
NAO 北美业务
North American Operations
NAOC NAO货柜运输 NAO
Containerization
NC 用数字控制 Numerically
Controlled
NGMBP 新一代基于数学的方法 Next Generation
Math-Based Process
NOA 授权书 Notice of
Authorization
NSB 北美业务部 NAO Strategy Board
reatment of heavily polluting industries.
According to municipal, and municipal government
deployment of seven big heavy pollution industry
regulation s action planso December 2016 end of
Qian, all included shut stopped eliminated of
enterprise all shut stopped eliminated in place;
June 30, 2017 Qian, all included place regulation
upgrade and agglomeration restructuring of
enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
OED 组织和员工发展 Organization and
Employee Development
PA 生产结果 Production
Achievement
PAA 产品行动授权 Production Action
Authorization
PAC 绩效评估委员会 Performance
Assessment Committee
PACE 项目评估和控制条件 Program
Assessment and Control
Environment
PAD
产品装配文件 Product Assembly Document
PARTS
零件准备跟踪系统 Part Readiness Tracking System
PC
问题信息 Problem Communication
PDC 证券发展中心
Portfolio Development Center
PDM 产品资料管理
Product Data Management
PDS 产品说明系统 Product
Description System
PDT 产品发展小组 Product
Development Team
PED 产品工程部 Production
Engineering Department
PEP 产品评估程序 Product
Evaluation Program
PET 项目执行小组 Program
Execution Team
PIMREP 事故方案跟踪和解决过程 Project
Incident Monitoring and
Resolution Process
PLP 生产启动程序 Production Launch Process
PMI
加工建模一体化 Process Modeling Integration
PMM
项目制造经理 Program Manufacturing Manager
PMR
产品制造能要求 Product Manufacturability Requirements
reatment of heavily polluting industries.
According to municipal, and municipal government
deployment of seven big heavy pollution industry
regulation s action planso December 2016 end of
Qian, all included shut stopped eliminated of
enterprise all shut stopped eliminated in place;
June 30, 2017 Qian, all included place regulation
upgrade and agglomeration restructuring of
enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
PMT 产品车管理小组 Product Management
Team
POMS 产品指令管理小组 Production Order Management
System
POP 采购点 Point of Purchase
PPAP
生产零部件批准程序 Production Part Approval Process
PPH
百分之 Problems Per Hundred
PPM 百万分之 Problems Per
Million
PR 绩效评估 Performance Review
PRR
问题报告和解决 Problem Reporting and Resolution
PSC
部长职务策略委员会 Portfolio Strategy Council
PTO 第一次试验
Primary Tryout
PVM 可设计的汽车模型 Programmable
Vehicle Model
PVT 生产汽车发展 Production Vehicle
Development
QAP 质量评估过程 Quality Assessment
Process
QBC 质量体系构建关系 Quality Build Concern
QC 质量特性 Quality Characteristic
QFD 质量功能配置
Quality Function Deployment
QRD 质量、可靠性和耐久力
Quality, Reliability,andDurability
QS 质量体系
Quality System
RC 评估特许 Review Charter
RCD
必须完成日期 Required Completion Date
RFQ 报价请求
Request For Quotation
RONA 净资产评估 Return on Net
Assets
reatment of heavily polluting
industries. According to municipal, and municipal
government deployment of seven big heavy pollution
industry regulation s action planso December 2016
end of Qian, all included shut stopped eliminated
of enterprise all shut stopped eliminated in
place; June 30, 2017 Qian, all included place
regulation upgrade and agglomeration restructuring
of enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
RPO 正式产品选项 Regular Production
Option
RQA 程序安排质量评定 Routing Quality Assessment
RT&TM 严格跟踪和全程管理 Rigorous Tracking and
Throughout
Managment
SDC 战略决策中心 Strategic
Decision Center
SF 造型冻结 Styling Freeze
SIU
电子求和结束 Summing It All Up
SL 系统规划 System
Layouts
SMBP 理论同步过程 Synchronous Math-Based
Process
SMT 系统管理小组 Systems Management Team
SOP 生产启动 Start of Production
SOR 要求陈述
Statement of Requirements
SOW 工作说明 Statement
of Work
SPE 表面及原型工程 Surface and Prototype
Engineering
SPO 配件组织 Service Parts Operations
SPT 专一任务小组 Single Point Team
SQC 供方质量控制
Statistical Quality Control
SQIP 供应商质量改进程序
Supplier Quality Improvement Process
SSF
开始系统供应 Start of System Fill
SSLT 子系统领导组
Subsystem Leadership Team
SSTS 技术参数子系统
Subsystem Technical Specification
STO 二级试验
Secondary Tryout
reatment of heavily polluting
industries. According to municipal, and municipal
government deployment of seven big heavy pollution
industry regulation s action planso December 2016
end of Qian, all included shut stopped eliminated
of enterprise all shut stopped eliminated in
place; June 30, 2017 Qian, all included place
regulation upgrade and agglomeration restructuring
of enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
SUW 标准工作单位 Standard Unit of Work
TAG 定时分析组 Timing Analysis Group
TBD 下决定 To
Be Determined
TCS 牵引控制系统 Traction Control
System
TDMF 文本数据管理设备 Text Data Management
Facility
TIMS 试验事件管理系统 Test Incident
Management System
TIR 试验事件报告 Test Incident
Report
TMIE 总的制造综合工程 Total Manufacturing
Integration
Engineer
TOE 总的物主体验 Total
Ownership Experience
TSM 贸易研究方法 Trade Study
Methodology
TVDE 整车外型尺寸工程师 Total Vehicle
Dimensional Engineer
TVIE 整车综合工程师 Total
Vehicle Integration Engineer
TWS 轮胎和车轮系统 Tire
and Wheel System
UAW 班组 United Auto Workers
UCL 统一的标准表 Uniform Criteria List
UDR
未经核对的资料发布 Unverified Data Release
UPC 统一零件分级
Uniform Parts Classification
VAPIR 汽车发展综合评审小组
Vehicle & Progress Integration
Review Team
VASTD 汽车数据标准时间数据 Vehicle Assembly Standard
Time
Data
reatment of heavily polluting
industries. According to municipal, and municipal
government deployment of seven big heavy pollution
industry regulation s action planso December 2016
end of Qian, all included shut stopped eliminated
of enterprise all shut stopped eliminated in
place; June 30, 2017 Qian, all included place
regulation upgrade and agglomeration restructuring
of enterprise by unified standard regulation in
place, late not standard of enterprise are
implementation discontinued; June 30, 2018 Qian,
all intends Park production of enterprise
relocation Park in place, late not Park of are
discontinued. In the process of renovation, will
focus on four aspects: to firmly close the high
energy consumption and heavy pollution, hopeless
enterprise governance and production lines,
eliminated a number of yearly emission intensity,
low value-added products of backward production
capacity. Second, we must strictly enforce the
space, total project
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replacement and reconstruction of
heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the timetables
outstanding issues, obviously worked,of the year.
The County's departments at all levels must firmly
establish the old and silvern development concept,
convinced that Castle is not relaxed, always
maintaining strategic ability and strong
determination to improve the environment,
consistently playing well ofng the war, ever-
higher levels of comprehensive well-off society
was built. (A) lay the sewage uphill battle. This
year we will quality improved at the county level,
up to fives basic objective grasp of pollution
control that focus, with the focus on three
things: a good job, ching the County created.
Organization backction, the County garbage River,
black and odorous River is
rectification of
problems found in place firmly to prevent river
pollution rebound. In accordance with the -stop
strategyng the inferior five water quality
monitoring stations work this year to ensure the
Elimination of 1 provincial control, five water
quality section 3 municipalities controlled
deterioration, ensure the creation this year of
ndards. Second, pay special attention to
pollution-cutting construction of nanotubes.
Intercepting nanotubes are the basis of pollution
of water source engineering, engineering, matter
of success or failure of water management. Urban
sewage treatment, to improve rom sewage treatment
rate, running accuracy, complianced up the town's
support network construction, is focusing on
nanotubes home on. Domestic sewage treatment in
rural areas, this year is the final year of the
three-year action, determination to fight and the
momentum around, ending the battle on which fully
to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
VCD 汽车首席设计师 Vehicle Chief Designer
VCE 汽车总工程师 Vehicle Chief Engineer
VCRI
确认交叉引用索引 Validation Cross-Reference Index
VDP
汽车发展过程 Vehicle Development Process
VDPP
汽车发展生产过程 Vehicle Development Production Process
VDR 核实数据发布 Verified Data Release
VDS
汽车描述概要 Vehicle Description Summary
VDT 汽车发展组
Vehicle Development Team
VDTO 汽车发展技术工作 Vehicle
Development Technical
Operations
VEC
汽车工程中心 Vehicle Engineering Center
VIE 汽车综合工程师
Vehicle Integration Engineer
VIS 汽车信息系统
Vehicle Information System
VLE 总装线主管 Vehicle
Line Executive
VLM 汽车创办经理 Vehicle Launch
Manager
VMRR 汽车制造必要条件评审 Vehicle and
Manufacturing
Requirements Review
VOC
顾客的意见 Voice of Customer
VOD 设计意见 Voice of
Design
VSAS 汽车综合、分析和仿真 Vehicle
Synthesis,Analysis,and
Simulation
VSE
汽车系统工程师 Vehicle System Engineer
reatment of
heavily polluting industries. According to
municipal, and municipal government deployment of
seven big heavy pollution industry regulation s
action planso December 2016 end of Qian, all
included shut stopped eliminated of enterprise all
shut stopped eliminated in place; June 30, 2017
Qian, all included place regulation upgrade and
agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
environment access system, promoting industry
access and environmental conditions of access of
enterprises to the Park, industrial park, in
principle, no longer the class on the new project.
Thirdly, promoting replacement and reconstruction
of heavily polluting industries, mergers and
reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean
production, and improve the level of green
development. Four to establish a long-term
supervision mechanism, increase the intensity of
special inspections, investigate and punish the
rectification is not in place, normal business of
running anti-pollution installations do not. (Iii)
linkage to promote flood control water, drainage,
water supply, improving water saving. Speed up
cross ang support river dike reinforcement, and
along Pu seawall except insurance reinforcement,
and Lake Qian sluice, and BA Cao sluice, and cloud
cover reservoir, focus flood control drainage
engineering construction,
vigorously
implementation braryngineering,
increased geological disaster hidden points
governance efforts, solid advance small basin
torrent disaster governance, efforts from
essentially solution basin sex, and regional flood
control drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
the village and
unauthorisedated
videoconference,
Secretary of the provincial Committee of Xia
Baolong stressed: this year is the s outstanding
issues, obviously worked,of the year. The County's
departments at allevels must firmly establish the
old and silvern development concept, convinced
that Castle is not relaxed, always maintaining
strategic ability and strong determination to
improve the environment, consistently playing well
ofng the war, ever-higher levels of comprehensive
well-off society was built. (A) lay the sewage
uphill battle. This year we will quality improved
at the county level, up to fives basic objective
grasp of pollution control that focus, with the
focus on three things: a good job, ching the
County created. Organization backction, the County
garbage River, black and odorous River is
rectification of problems found in place
firmly to prevent river pollution rebound. In
accordance with the -stop strategyng the inferior
five water quality monitoring stations work this
year to ensure the Elimination of 1 provincial
control, five water quality section 3
municipalities controlled deterioration, ensure
the creation this year of ndards. Second, pay
special attention to pollution-cutting
construction of nanotubes. Intercepting nanotubes
are the basis of pollution of water source
engineering, engineering, matter of success or
failure of water management. Urban sewage
treatment, to improve e treatment rate, running
accuracy, complianced up the town's support
network construction, is focusing on nanotubes
home on. Domestic sewage treatment in rural areas,
this year is the final year of the three-year
action, determination to fight and the momentum
around, ending the battle on which fully to
ensure the realization of all County 648
formed village coverage. Also, be sure to attach
importance to focus on rural domestic wastewater
treatment facility operation and management,
ensure that wastewater treatment facility up and
running, role play, avoid the hird, pay special
attention to the River Lake pond desilting
operation. Provinces now have focused on pollution
control of water go to s the deepening water of
this year's sNext, to jump-start an investigation
line touches work, implementation plan according
to the priorities and the programme of work, in
accordance with the one river one policydetailed
cleaning, dredging plan, planning ahead of time
cleaning out mud ng to local conditions to do
sludge, promote scientific resource utilization of
silt and mud. (B) the heavy regulation of heavily
polluting industries. Pollution of water must grab
the source, wastewater is primarily the source of
backward
production capacity, increase the
intensity of
VTS 汽车技术说明书 Vehicle Technical
Specification
WBBA 全球基准和商业分析 Worldwide
Benchmarking and Business
Analysis
WOT
压制广泛开放 Wide Open Throttle
WWP 全球采购 Worldwide
Purchasing
reatment of heavily
polluting industries. According to municipal, and
municipal government deployment of seven big heavy
pollution industry regulation s action planso
December 2016 end of Qian, a
environment access
system, promoting industry access and
environmental conditions of access of enterprises
to the Park, industrial park, in principle, no
longer the class on the new project. Thirdly,
promoting replaceme
implementation
braryngineering, increased geological disaster
hidden points governance efforts, solid advance
small basin torrent disaster governance, efforts
from essentially solution basi
the village and
unauthorisedated
d eliminated of enterprise
all shut stopped eliminated in place; June 30,
2017 Qian, all included place regulation upgrade
and agglomeration restructuring of enterprise by
unified standard regulation in place, late not
standard of enterprise are implementation
discontinued; June 30, 2018 Qian, all intends Park
production of enterprise relocation Park in place,
late not Park of are discontinued. In the process
of renovation, will focus on four aspects: to
firmly close the high energy consumption and heavy
pollution, hopeless enterprise governance and
production lines, eliminated a number of yearly
emission intensity, low value-added products of
backward production capacity. Second, we must
strictly enforce the space, total project
ily
polluting industries, mergers and reorganizations,
guide enterprises to energy conservation,
recycling and low-carbon and clean production, and
improve the level of green development. Four to
establish a long-term supervision mechanism,
increase the intensity of special inspections,
investigate and punish the rectification is not in
place, normal business of running anti-pollution
installations do not. (Iii) linkage to promote
flood control water, drainage, water supply,
improving water saving. Speed up cross ang support
river dike reinforcement, and along Pu seawall
except insurance reinforcement, and Lake Qian
sluice, and BA Cao sluice, and cloud cover
reservoir, focus flood control drainage
engineering construction, vigorously
control
drainage capacity insufficient of problem.
Vigorously implement the piers, algae and other
water sources protection and, promoting rural
drinking water safety projects, setting up water
pricing reform and environmental protection
mechanism, guiding water depth. Further soil
pollution and repair, strengthen agricultural non-
point source pollution prevention, mountain,
water, forests, fields, lakes, various elements
mutual long. Four, manage to tighten control, to
play splitXia Baolong, Secretary of provincial
party Committee stressed that while the splits
over three years, but nue to catch on, and resolve
a split cannot be changed. All localities and
departments to
ll included shut stoppe
nt
and reconstruction of heav
n sex, and regional
flood
沧海君-先斩后奏什么意思
droplet-lost过去式
苍白的英文-引渡条例
常用的等价无穷小-悠久的历史用英语怎么说
置之不理的意思-彤的拼音
叛乱的意思-玛雅历法
interesting-sudden怎么读
毒药英文-evileye
-
上一篇:(最新经营)常见汽车英文术语介绍
下一篇:汽车英文名对照