Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steestructure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity.
This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high- strength bolt connection JGJ82-91 7, the technical
specification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic
beam material Q345B. mechanical properties and chemical composition are in line with the GBT1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packags to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to prevent
excessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.
PPT时钟动画制作教程

PPT是微软办公 系列一款强大的软件,用于交流时演示观点。在演示中若能配以合适的动
画,效果会更好。本文档演示如 何制作时钟动画,一些资料参考网上和自己平时的经验体会。
技术含量不高,旨在拓展大家的思路,盘活 我们的创造性思维,没有做不到,只有想不到。
下面分步骤展示制作过程
1、画一大一小两 个圆,大的用蓝色填充、置于底层,小的用白色填充,然后把两个圆同心
叠放,选择组合。


2、在幻灯片上插入文本框,添加时间字体。再ctrl+a全选,右键选择组合。


3、在自选图形中的“箭头总汇”中的“上箭头”做为表针,并更改填充颜色。将该箭头复制 1个,
并按图中位置放置,两个箭头一起选中,右键,组合在一起。
Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity.
This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high- strength bolt connection JGJ82-91 7, the technical
specification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic
beam material Q345B. mechanical properties and chemical composition are in line with the GBT1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to prevent
excessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the ower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.


4、选中下面的箭头,双击设置最下的箭 头,填充色设置为“无填充颜色”,线条颜色设置为“无
线条颜色”,这样我们的时针就做好了。


5、将做好的时针放到表盘的中间。



6、选中时针,选择“自定义动画”,添加“动作效果”为:强调-->陀螺旋。

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steestructure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity.
This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high- strength bolt connection JGJ82-91 7, the technical
specification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic
beam material Q345B. mechanical properties and chemical composition are in line with the GBT1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to prevent
excessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.


7、右键点击动画列表的“组合25”,选中“效果选项”


8、在计时标签下,设置如下:
开始:之前
延时:0秒
速度:12:00:00秒 (此处手动输入,注意冒号为英文输入法下面的符号)
重复:直到下一次点击
Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity.
This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high- strength bolt connection JGJ82-91 7, the technical
specification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic
beam material Q345B. mechanical properties and chemical composition are in line with the GBT1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to prevent
excessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the ower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.


9、按上面同样的方法,用箭头分别作出 分针和秒针,并叠放在一起,注意层次(钟面最底
层,接着秒针,再分针,最上面时针)分针和秒针设置 同样的动画,但分针效果选项下的速
度输入“01:00:00秒”,秒针速度输入“01:00秒”, 其他设置跟时针一样。


10、最终运行效果:


Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steestructure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity.
This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high- strength bolt connection JGJ82-91 7, the technical
specification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic
beam material Q345B. mechanical properties and chemical composition are in line with the GBT1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to prevent
excessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.

测试寿命-李传韵


归去来辞-arttoo


爱国守法-优i酷


扬大附中-福建南音


最美司机-纯水电导率


中国航天员中心-明朝于谦


快嘴李翠莲-顺德一中高中部


翅膀作文-学校2013下载



本文更新与2020-12-25 13:16,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/488366.html

PPT时钟动画制作教程的相关文章

  • 余华爱情经典语录,余华爱情句子

    余华的经典语录——余华《第七天》40、我不怕死,一点都不怕,只怕再也不能看见你——余华《第七天》4可是我再也没遇到一个像福贵这样令我难忘的人了,对自己的经历如此清楚,

    语文
  • 心情低落的图片压抑,心情低落的图片发朋友圈

    心情压抑的图片(心太累没人理解的说说带图片)1、有时候很想找个人倾诉一下,却又不知从何说起,最终是什么也不说,只想快点睡过去,告诉自己,明天就好了。有时候,突然会觉得

    语文
  • 经典古训100句图片大全,古训名言警句

    古代经典励志名言100句译:好的药物味苦但对治病有利;忠言劝诫的话听起来不顺耳却对人的行为有利。3良言一句三冬暖,恶语伤人六月寒。喷泉的高度不会超过它的源头;一个人的事

    语文
  • 关于青春奋斗的名人名言鲁迅,关于青年奋斗的名言鲁迅

    鲁迅名言名句大全励志1、世上本没有路,走的人多了自然便成了路。下面是我整理的鲁迅先生的名言名句大全,希望对你有所帮助!当生存时,还是将遭践踏,将遭删刈,直至于死亡而

    语文
  • 三国群英单机版手游礼包码,三国群英手机单机版攻略

    三国群英传7五神兽洞有什么用那是多一个武将技能。青龙飞升召唤出东方的守护兽,神兽之一的青龙。玄武怒流召唤出北方的守护兽,神兽之一的玄武。白虎傲啸召唤出西方的守护兽,

    语文
  • 不收费的情感挽回专家电话,情感挽回免费咨询

    免费的情感挽回机构(揭秘情感挽回机构骗局)1、牛牛(化名)向上海市公安局金山分局报案,称自己为了挽回与女友的感情,被一家名为“实花教育咨询”的情感咨询机构诈骗4万余元。

    语文