Han xiong company introduction
Han
xiong
heating
technology
LTD,
Was
established
in
is
a
professional company of heating system engineering Company devotes to
the boiler's sales, installation and service system and Heating technology
development
and
application.
With
sales
department,
technology
department, engineering department, after-sale service, contract, etc, with
38
employees,
including
bachelor
degree
personnel,
senior
technical
accounted
for
70%
of
the
staff
have
five
titles,
gathers
the
design,
installation
and
debugging
of
professional
talents.
Especially
is
Technology and construction site personnel, all have years of experience,
a number of projects in the operation.
At present, the company is in Shanghai and its neighboring region
has successfully run multiple projects. Such as Shanghai ( ruijin )hospital,
American
LuBoRun Shanghai
chemical
plant,
American
national starch
Shanghai
factory,
Shanghai
Kowloon
hotel,
(LianYang)
ibis
hotel,( yuyuan ) hotel,( jiangshan) building projects. Each year, company
growth
more
than
30%
of
the
growing
business,
is
a
vigorous
professional heating company.
Long-term since, adhering to the
Exploration
and
the
pursuit
of
excellence,
solid
technical
strength,
excellent performance products manifest, Establish credit market image,
for
clients
to
create
the
perfect
project,
obtain
approval
and
praise
of
customers.
3
、
Boiler manufacture and acceptance criteria.
4
、
Construction scheme.
The first chapter
formulation explanations
Project profile
This
project
is
add
steam
boiler
and
accessory
equipment
procurement
projects, heat by Italian law Laurie wholly owned company production of
steam boiler unit
Power: 4200kw.
The second Chapter
project goals
Quality target
:
good
★
Project goals
:
Total duration of 30 days.
★
Safe
civilized
construction
goal
:
Shanghai
site.
Jiaxing
comprehensive
site.
The Third Chapter:
The construction period
1. Total duration
This commencement notice shall prevail, according to owner according
to the actual date for 30 days total duration.
In combination with the
engineering characteristics, and similar project construction experience,
after carefully calculated out.
2. Labor investment plan
Companies
provide
labor
in
this
project.
According
to
the
safety
and
guarantee
the
construction
progress
Arrange
labor.
This
project
construction
for
six
people
,
the
labor
into
exits
according
to
different
parts of the project.
The fourth chapter
construction organization and project management
First,
the
project
period
is
expected
to
30
days,
the
condition
of
construction etc.
Including:
1
、
Before
installation:
2
the
open-package
inspection
and
acceptance
of
the
equipment,
the
inspection
and
calibration
equipment
foundation,
3
The
main
equipment
and
auxiliary
equipment
4 .Boiler
flue system of manufacture and installation.
1. Engineering construction qualifications.
Construction in the boiler room must end, namely basic civil work
within the plant has been completed, and paint floor level.
Used
in
construction
of
electricity
(mechanical
construction
electricity) has been connected to the site or will be able to connect to the
site
is
more
convenient.
And
lighting
electricity,
lamps
and
lanterns
is
complete.
To
ensure
the
normal
operation
of
the
construction
of
party
A,
please provide constructors or placed tools and equipment parts storage
room unpacking after a set of boiler (or lock).
2. The construction organization and personnel
Project management personnel:
3. The boiler installation process
To
ensure
the
engineering
quality,
provide
excellent
service,
Our
company strictly according to my except the fuel gas boiler installation
process,
also
must,
in
accordance
with
the
construction
of
factory
of
boiler
installation
of
boiler
design
drawings
and
technical
documents,
product
quality
documents,
installation
and
operation
manuals
and
design
institute
of
design
Draw
judge,
formulate
the
best
installation
process
(installation
process).
The
boiler
installation
scheme
(
basically
with
arrangement
for
sequence)
The
fifth
chapter
:
Construction
quality
control
measures
and
quality
detection
First, quality assurance measures
The
engineering
practice
merit
goal
management,
the
construction
personnel firmly established
To ensure the project reach Shanghai qualified projects.
Second, the flue engineering quality guarantee measures
Ⅰ
accurate location, bury should level off.
Ⅱ
Tubes shall be closely contact, Fixed firmly
Ⅲ
No hot elongated pipe-hangers, should be installed vertically rods
Ⅳ
A
heat
pipe
suspenders
elongation,
the
reverse
direction
to
thermal
expansion
Ⅴ
Fixed in the building structure pipe, hanger, shall not affect the safety
of the structure
Ⅵ
scaffolds shall conform to the provisions of the distance.
The Sixth chapter:
Safety Caution
Before installation should be tried in crane, leave the ground in the
boiler
should
be
suspended
after
checking
whether
the
rigging
safe,
reliable,
Welding
and
geo-drilling
must
be
strictly
implemented
operation
system, due to special guard over homework,
Entering the site must wear a helmet.
Banned hidden construction, fatigue,
Prohibit thrown tools, pipe, prevent scarred,
Accidents control target as zero accidents.
5
、
delivery
Delivery:
period: Boiler equipment 45 days after the signing of the
contract, the installation period 35 days
汉雄公司介绍
Han xiong company introduction
汉雄热力技术有限公司成立于
2004
年,是一个从事供暖系统工
程的专业公司。
Han xiong
heating
technology
LTD,
Was
established
in
is
a
professional company of heating system engineering
公司致力于锅炉的销售、
系统安装 、
售后服务以及暖通技术的开发与
运用。
Company devotes to the boiler's sales, installation and service system and
Heating technology development and application.
设有销售部、技术部、工程部、售后服务部、合约部等,拥有
38
名
员工,
其中本科或本科以上学历人员占
70%
,
具有高级 技术职称的员
工有
5
名,汇集了锅炉设计、安装、系统调试的专业人才。
With
sales
department,
technology
department,
engineering
department,
after-sale
service,
contract,
etc,
with
38
employees,
including
bachelor
degree
personnel,
senior
technical
accounted
for
70%
of
the
staff
have
five titles, gathers the design, installation and debugging of professional
talents.
特别是技术和现场施工人员,
均有多 年丰富的工作经验,
参与过多个
项目的操作。
Especially
is
Technology
and
construction
site
personnel,
all
have
years of experience, a number of projects in the operation.
目前,公司在上海及周边地区已成功运作多个项目,
At present, the company is in Shanghai and its neighboring region
has successfully run multiple projects
例如上海瑞金医院,
美国路博润上海化工厂,
美国国民淀粉上海
工厂,上海九龙宾馆,联洋宜必思酒店,豫园大酒店,江山大厦等项
擢升-transistor
擢升-transistor
擢升-transistor
擢升-transistor
擢升-transistor
擢升-transistor
擢升-transistor
擢升-transistor
本文更新与2021-01-21 07:28,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/543082.html