Han xiong company introduction



Han
xiong
heating
technology
LTD,
Was
established
in

is
a
professional company of heating system engineering Company devotes to
the boiler's sales, installation and service system and Heating technology
development
and
application.
With
sales
department,
technology
department, engineering department, after-sale service, contract, etc, with
38
employees,
including
bachelor
degree
personnel,
senior
technical
accounted
for
70%
of
the
staff
have
five
titles,
gathers
the
design,
installation
and
debugging
of
professional
talents.
Especially
is
Technology and construction site personnel, all have years of experience,
a number of projects in the operation.
At present, the company is in Shanghai and its neighboring region
has successfully run multiple projects. Such as Shanghai ( ruijin )hospital,
American
LuBoRun Shanghai
chemical
plant,
American
national starch
Shanghai
factory,
Shanghai
Kowloon
hotel,
(LianYang)
ibis
hotel,( yuyuan ) hotel,( jiangshan) building projects. Each year, company
growth
more
than
30%
of
the
growing
business,
is
a
vigorous

professional heating company.
Long-term since, adhering to the
Exploration
and
the
pursuit
of
excellence,
solid
technical
strength,
excellent performance products manifest, Establish credit market image,
for
clients
to
create
the
perfect
project,
obtain
approval
and
praise
of
customers.
3

Boiler manufacture and acceptance criteria.
4

Construction scheme.

The first chapter



formulation explanations

Project profile

This
project
is
add
steam
boiler
and
accessory
equipment
procurement
projects, heat by Italian law Laurie wholly owned company production of
steam boiler unit


Power: 4200kw.

The second Chapter



project goals

Quality target

good








Project goals

Total duration of 30 days.










Safe
civilized
construction
goal

Shanghai
site.
Jiaxing

comprehensive

site.

The Third Chapter:



The construction period



1. Total duration

This commencement notice shall prevail, according to owner according
to the actual date for 30 days total duration.

In combination with the
engineering characteristics, and similar project construction experience,
after carefully calculated out.

2. Labor investment plan

Companies
provide
labor
in
this
project.
According
to
the
safety
and
guarantee
the
construction
progress
Arrange
labor.
This
project
construction
for
six
people
,
the
labor
into
exits
according
to
different
parts of the project.



The fourth chapter


construction organization and project management
First,
the
project
period
is
expected
to
30
days,
the
condition
of
construction etc.

Including:
1

Before
installation:
2
the
open-package
inspection
and
acceptance
of
the
equipment,
the
inspection
and
calibration
equipment

foundation,
3
The
main
equipment
and
auxiliary
equipment

4 .Boiler
flue system of manufacture and installation.
1. Engineering construction qualifications.
Construction in the boiler room must end, namely basic civil work
within the plant has been completed, and paint floor level.
Used
in
construction
of
electricity
(mechanical
construction
electricity) has been connected to the site or will be able to connect to the
site
is
more
convenient.
And
lighting
electricity,
lamps
and
lanterns
is
complete.
To
ensure
the
normal
operation
of
the
construction
of
party
A,
please provide constructors or placed tools and equipment parts storage
room unpacking after a set of boiler (or lock).
2. The construction organization and personnel
Project management personnel:
3. The boiler installation process
To
ensure
the
engineering
quality,
provide
excellent
service,
Our
company strictly according to my except the fuel gas boiler installation
process,
also
must,
in
accordance
with
the
construction
of
factory
of
boiler
installation
of
boiler
design
drawings
and
technical
documents,
product
quality
documents,
installation
and
operation
manuals
and
design
institute
of
design
Draw
judge,
formulate
the
best
installation
process

(installation

process).

The
boiler
installation
scheme

(
basically
with
arrangement
for
sequence)

The
fifth
chapter
:

Construction
quality
control
measures
and
quality
detection
First, quality assurance measures
The
engineering
practice
merit
goal
management,
the
construction
personnel firmly established
To ensure the project reach Shanghai qualified projects.

Second, the flue engineering quality guarantee measures


accurate location, bury should level off.



Tubes shall be closely contact, Fixed firmly


No hot elongated pipe-hangers, should be installed vertically rods


A
heat
pipe
suspenders
elongation,
the
reverse
direction
to
thermal
expansion

Fixed in the building structure pipe, hanger, shall not affect the safety
of the structure


scaffolds shall conform to the provisions of the distance.




The Sixth chapter:

Safety Caution
Before installation should be tried in crane, leave the ground in the

boiler
should
be
suspended
after
checking
whether
the
rigging
safe,
reliable,
Welding
and
geo-drilling
must
be
strictly
implemented
operation
system, due to special guard over homework,
Entering the site must wear a helmet.
Banned hidden construction, fatigue,
Prohibit thrown tools, pipe, prevent scarred,
Accidents control target as zero accidents.

5



delivery
Delivery:


period: Boiler equipment 45 days after the signing of the
contract, the installation period 35 days




汉雄公司介绍

Han xiong company introduction





汉雄热力技术有限公司成立于
2004
年,是一个从事供暖系统工
程的专业公司。
Han xiong

heating
technology
LTD,
Was
established
in

is
a

professional company of heating system engineering
公司致力于锅炉的销售、
系统安装 、
售后服务以及暖通技术的开发与
运用。

Company devotes to the boiler's sales, installation and service system and
Heating technology development and application.
设有销售部、技术部、工程部、售后服务部、合约部等,拥有
38

员工,
其中本科或本科以上学历人员占
70%

具有高级 技术职称的员
工有
5
名,汇集了锅炉设计、安装、系统调试的专业人才。

With
sales
department,
technology
department,
engineering
department,
after-sale
service,
contract,
etc,
with
38
employees,
including
bachelor
degree
personnel,
senior
technical
accounted
for
70%
of
the
staff
have
five titles, gathers the design, installation and debugging of professional
talents.
特别是技术和现场施工人员,
均有多 年丰富的工作经验,
参与过多个
项目的操作。

Especially
is
Technology
and
construction
site
personnel,
all
have
years of experience, a number of projects in the operation.
目前,公司在上海及周边地区已成功运作多个项目,

At present, the company is in Shanghai and its neighboring region
has successfully run multiple projects
例如上海瑞金医院,
美国路博润上海化工厂,
美国国民淀粉上海
工厂,上海九龙宾馆,联洋宜必思酒店,豫园大酒店,江山大厦等项

擢升-transistor


擢升-transistor


擢升-transistor


擢升-transistor


擢升-transistor


擢升-transistor


擢升-transistor


擢升-transistor



本文更新与2021-01-21 07:28,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/543082.html

注明您的公司名用拼音Hanxiong,如用英文会翻译成(的相关文章

  • 爱心与尊严的高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊严高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊重的作文题库

    1.作文关爱与尊重议论文 如果说没有爱就没有教育的话,那么离开了尊重同样也谈不上教育。 因为每一位孩子都渴望得到他人的尊重,尤其是教师的尊重。可是在现实生活中,不时会有

    小学作文
  • 爱心责任100字作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任心的作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
注明您的公司名用拼音Hanxiong,如用英文会翻译成(随机文章