maps-
一
.
產品
1.
Memory Socket:
記憶體插槽
DIMM: Dual In Line Memory Module Socket
雙向記憶體擴充槽
結構
: Housing
塑膠
Contact
端子
---carrier
沿邊料
+Bellow + tail + V-cut
M.H.D. : Metal Hold Down
金屬卡勾
Ejector
2.
H/D: Header
結構
: housing, contact, four wall, key, mating, stand off, tail, kink, pin, post
3.
F/C: Flat Cable
扁平排線
結構
: IDC: Insulation Displacing Connector
絕緣刺破連接器
Cover, S/R (Strain Relief), Cable
二
.
制程
1.
Stranding wire:
絞線
2.
Cable extrusion:
線纜押出
3.
Stamping:
沖壓
---Stretching wire
抽線
4.
Plating:
電鍍
5.
Molding:
成型
---cavity, die /mold, core pin (
公模
,
模仁
), cavity pin (
母模
)
6.
Assembly:
裝配
1
三
.
檢測與設備
1.
open-short test:
導通測試
2.
Hi-pot:
耐高壓測試
3.
Projector:
投影機
4.
callipers:
卡尺
5.
microscope:
顯微鏡
6.
multimeter:
萬用電表
7.
oven:
高溫爐
8.
salt spray tester:
鹽水噴霧機
9.
voltage resistant :
耐電壓測試
10.
elongation test:
伸長率測試
11.
steam aging:
蒸氣老化試驗
12.
weight:
砝碼
13.
balance:
天平
四
.
Terms:
Check
Inspect
Sampling
dimension (DIM)
2
檢查
檢驗
抽樣
尺寸
tolerance
true position
revision (Rev.)
quantity(Q
’
ty)
quality
work in process
specification (Spec.)
normal
tightened
reduced
critical defect (CRI.)
major defect (MAJ.)
minor defect (MIN.)
accept
reject
waive
scrap
rework
sort
scale
3
公差
真位度
版次
數量
質量
在制品
規格
正常
加嚴
減量
嚴重缺點
主要缺點
次要缺點
允收
拒收
特采
報廢
重工
挑選
比例
location
reference
(REF.)
marking
Appearance Inspection
Lead time (L/T)
Line down
Warehouse
Inventory
Pallet
Carton
Packing
Gold
Nickel
Tin
Lead
五
.
縮寫
1.
B/M: Board Mount
2.
PBG: Products Business Group
3.
3C: Computer, Communication, Consumer
4
位置
參考
標記
外觀檢驗
前置時間
斷線
倉庫
庫存
棧板
紙箱
包裝
金
鎳
錫
鉛
4.
ZD: Zero Defect
5.
VP: Vice President
6.
MGR: Manager
7.
QC: Quality Control
8.
QA: Quality Assurance
9.
TQC: Total Quality Control
10.
TQA: Total Quality Assurance
11.
IPQA: In Process Quality Audit
12.
IPQC: In Process Quality Control
13.
FQC: Final Quality Control
14.
OBA: Out of Box Audit
15.
IQC: Incoming Quality Control
16.
OQC: Outgoing Quality Control
17.
QE: Quality Engineer
18.
PQE: Process Quality Engineer
19.
FAE: Field Application Engineer
20.
PM: Product Market
21.
C/N: Customer Number
22.
P/N: Part Number
23.
SOP: Standard Operation Procedure
5
24.
PMP: Product Management Plan
25.
ECN: Engineering Change Notice
26.
VDCS: Vendor Defects Correction Sheet
27.
SWR: Special Work Request
28.
FAR: Failure Analysis Report
29.
CAR: Corrective Action Report
30.
CCTF: Customer Complaint Track Form
31.
CSTF: Customer Service Track Form
32.
FMEA: Failure Mode & Effect Analysis
33.
QAN: Quality Alarm Notice
34.
AVL: Approved Vendor List
35.
BOM: Bill of Material
36.
WDR: Weekly Delivery Requirement
37.
TIP: Tip Innovation Plan
38.
QCC: Quality Control Circle
39.
QIT: Quality Improvement Team
40.
5W1H: When, Where, Who, What, Why, How
41.
5M: Man, Machine, Material, Method, Measurement
42.
FAI: First Article Inspection
43.
AQL: Accept Quality Level
6
maps-
maps-
maps-
maps-
maps-
maps-
maps-
maps-
本文更新与2021-01-22 07:42,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/548973.html