-
译文来源:美国
PE
杂志建筑给排水工程师
p>
2010
年第
10
期
 
 
The
multilevel 
residential
housing 
is 
given
and 
drains 
off
water several questions designed
 
Summary : This text give
and drain off water on multilevel residential
housing design 
supply 
water
the 
exertion 
of
the 
tubular
product 
, 
Way
of 
laying 
of
pipeline, 
water
gauge produce family set up,
establishment and air conditioner condensation
water of 
pot-type 
boiler
discharge 
issue
goes 
on 
the
discussion 
, 
And
put 
forward 
some
concrete views. 
Keyword: 
Skyscraper,
supply 
water 
the
tubular 
product 
,
the 
pipeline 
is
laid, 
The 
water
gauge, the solar water heater 
 
 
 
The
skyscraper is simple with its auxiliary facility,
the fabrication cost is low, the
characteristic such as being convenient
of estate management, Receive the welcomes
of the real estate developer and vast
resident of small and medium-sized cities very
much. 
How 
project
planning 
and
design 
of
inhabited 
region,
scientific 
and
technological 
industry
of 
comfortable
house, 
lead 
the
request 
according
to 
2000, 
Improve
the design level of the house, build out a
comfortable living space for each
household, 
It 
is
each 
designers
duty. 
As 
the
heart 
of 
the
house 
--The
kitchen, 
bathroom, is
that the function is
complicated, hygiene, safe and
comfortable degree 
are
expected 
much, 
It
is 
miscellaneous
to 
build, 
the
space 
expecting
much 
in
technology. So, the designer must
consider synthetically with the idea and method of
global design that the kitchen,
bathroom give installation of the drainage
pipeline and 
equipment,etc. . Give and
drain off water on skyscraper design supply water
exertion, 
to lay pipeline of tubular
product, water gauge produce family set up,
establishment 
and empty of pot-type
boiler now Transfer condensation water discharge
issue discuss 
together with colleagues.
 
 
 
 
( 1)supply water tubular
product select problem for use Traditional
watersupply 
tubular product adopt zinc-
plated steel tube generally, because zinc-plated
steel tube 
exchange 
the
corrosion, 
Use
short-lived 
, 
use
for 
and 
send
domestic 
water
can 
satisfied with water
quality sanitary standard shortcoming, Ministry of
Construction is 
popularizing
the 
application
of 
the 
feed
pipe 
of 
plastics
energetically 
. 
A
lot 
of 
districts
and cities have already expressed regulations:
Forbid designing and using the 
zinc-
plated steel tube , use widely the feed pipe of
plastics. The plastics supply water 
In
charge of compared with metal pipeline, light, it
is fine to able to bear the intensity
of 
keeping, 
Send
obstruction 
little
liquid 
, 
able
to 
bear 
chemistry
better 
to 
corrode
performance, it is convenient to
install, The steel energy-conservation of the
province, 
merit 
of
having 
long
performance 
life
etc.. 
Supply
water 
and 
use
plastics 
pipeline:
Hard polyvinyl chloride( PVC-U), high
density polyethylene( HDPE), pay and unite
polyethylene( 
PEX)
, 
modify 
the
polypropylene( 
PP-R,
PP-C), 
gather
butene( 
PB),
aluminium 
mould
and 
compound 
and
in 
charge 
of
and 
the 
steel
is 
moulded 
and
compound 
and 
is
managed 
etc..
Choice 
of 
tubular
product 
economic
comparative 
course of
technology, technology should from pressure,
temperature, environment for 
use,
install method,etc. go on and consider, Combine
owners at the same time request 
and the
house of grade,carry on and fix after being
consider synthetically technology 
not
economic. 
The
above 
plastics
supply 
water
tubular 
product
can 
supply 
water
tubular product as house life. The
economic and functional house conciliating Strand
room in the face of the masses of with
low- and medium-level incomes resident, can
select 
for 
use
hygiene 
grades 
of
hard 
polyvinyl
chloride 
in
charge 
of 
as
feed 
pipe 
mainly,
In 
order 
to
reduce 
the
fabrication 
cost;
Medium-to-high 
grade
commodity 
apartment
available 
aluminium
Mould 
and
compound 
and 
in
charge 
of 
or
other 
plastics
supply 
water 
the
tubular 
product
as 
the 
feed
pipe. 
House 
mix
hot 
water
temperature 
that
water 
order
exceed 
600 
C,
so 
above-mentioned
tubular 
product
in 
charge 
of
except 
hard
polyvinyl 
chloride
and 
aluminium
plastics 
compound
and 
in 
charge of(
PE-AL-PE), Mostly the tubular product can be
regarded as the hot water 
pipeline of
the house. 
 
 
( 2) pipeline lay problem 1. give and
drain off water it set up there arent one that
in charge of 
1)Will install it in the corner place
of the kitchen, bathroom tomorrow. Adopting
this kind of way of laying more in the
design of house in the past, it is convenient for
it to construct, But will reveal the
pipeline and hinder the room beautifully tomorrow
Watch, 
the
households 
will
mostly 
be 
hidden
with 
the 
light
quality 
material
in 
the 
equipment
two times. 
 
2)Will
install 
it 
in
the 
overcast
angle 
place 
of
the 
outer 
wall
of 
the 
building
tomorrow. 
Way
this 
suitable 
for
southern 
weather
warm 
district
only, 
the 
minimum
temperature in winter cant be lower
than zero degrees Centigrade, In case water pipe
water-logging freeze ice is bloated to
split pipeline, influence household use. Pipeline
lay in outer wall, influence building
to be beautiful, too inconvenient on manage and
maintain in the future. 
3)Lay it in the pipeline well. This way
makes the room clean and beautiful , but
the 
pipeline 
well
has 
taken 
up
the 
area 
of
the 
bathroom, 
And
pipeline 
construct,
maintain 
relatively
more 
difficult.
Bathroom 
set 
up
concentrate 
pipeline
well, 
concentrate
pipeline 
on
assign 
in 
the
well 
feed 
pipe,
drain 
pipe, 
This
is 
that 
the
civilized importance lives in the
kitchen of comfortable house, bathroom Embodiment.
I think : Should consider the
establishment of the pipeline well of the bathroom
in the 
medium-to-high grade building
conceptual design of commodity apartment, Improve
quality 
of 
using
of 
bathroom
promptly 
so 
,
can 
solve 
hard
polyvinyl 
chloride
drain 
pipe rivers noise
heavy problem, Improve the environmental quality
level of the room; 
Whether
for 
bathroom 
in
the 
areas 
for
little 
economic
and 
functional
house 
and
Overcome 
difficulties
room, 
warm 
area
give 
and 
drain
off 
water 
and
set 
up 
and
in 
charge of and can
consider and lay in the outer wall in the South,
In order to increase 
using
the 
space 
of
the 
bathroom;
Pipeline 
install
and 
in 
the
room, 
should
influence 
kitchen, bathroom
every sanitary equipment use of function tomorrow
 
 
2. supply water
and prop up there arent 
tube House
supply 
water prop up and in
charge 
of 
pipe
diameter 
one 
≤
32mm, 
de 
of
battle,, 
little
plastics 
feed
pipe 
of 
pipe
diameter is the crooked state, So the
house supplies water and is propped up and in
 
1 
charge of
being recommended and adopted and set up secretly.
Supply water to prop 
up to manage
darkly There are thes way had: 
1)Set up in the brick wall secretly.
Wall turn on and in charge of trough in brick
when constructing, in charge of trough
width tube +20 mm, de of external diameter,,
degree 
of 
depth
tube 
external
diameter 
de, 
The
pipeline 
is
imbedded 
and
managed 
directly Trough, and
with in charge of card fix in trough of inning
charge of son. 
2)Whether pipe diameter
supply water and prop up and last 
de ≤
20mm,can set 
up 
at
floor 
secretly
piece 
make 
level
by 
layer. 
Turn
on 
and 
in
charge 
of 
trough
in 
floor( ground) the board
when constructing, it wides trough have to
be de +10 mm 
deeply 1/2 of
the de, Half pipeline imbed and in charge of
trough, and with in charge 
of card fix
in trough of inning charge of tube. Aluminium
mould compound and in 
charge
of 
and 
pay
and 
unite
polypropylene 
in
charge 
of
pipeline 
adopt
metal 
pipe
fittings connection, Must strengthen
and in charge of trough size when adopting and
set up secretly, and rivers some flood
peak loss relatively heavy. Assign the relative
house that concentrated to the kitchen,
bathroom interior hygiene utensil, Can adopt
and divide Water device go on and join
, divide water device whether one more than
branch in charge of and connect, every
hygiene utensil supply water and prop up and
in 
charge 
of
and 
connects 
and
publishes 
from
the 
water
dividing 
device
separately. 
Can already
prevent the tube burying the pipeline secretly
from being connected like 
this Permeate
the question. Can reduce some flood peak lost,
decrease the fabrication 
cost of pipe
networks 
 
 
3)Drain off water and prop up the tube
to lay House room drain off water and in
charge 
of 
and
should 
set 
up
at 
the 
time
of 
inning 
this
each, 
drain 
off
water 
and 
in
charge of permeating sideways like this
canning prevent the sewage from waiting for
the pollutant to enter the neighbor
family sideways, Will not influence the neighbor
either 
when 
the
pipeline 
is
maintained 
Normal
life 
of 
one.
Kitchen 
wash
water 
drainage of basin
propped up and in charge of generallying inserts
draining off water 
to stand to manage
this layer of floor sideways; Floor drain drain
off water propped 
up and in charge of
laying the room of lower floor. 
A lot
of 
colleagues 
think now:
Whether kitchen the ground it lay
ceramic tile of,whose name is clean in when need
develop 
with
water,not 
strong
in 
meaning 
to
set 
up 
floor
drain, 
So 
kitchen
set 
up 
ground
floor drain, avoid and drain off water and prop up
and in charge of and enter 
neighbor
family 
sideways
already 
so, 
Can
increase 
using
the 
space 
of
the 
kitchen .
Bathroom drain off water and prop up
and in charge of and lay concrete measure have
in this layer sideways inside:
 
1)Improve the bathroom
ground . Ground tendency high 150mm, adopt back
row 
type take stool pot, washing basin,
bath tub, water drainage of floor drain in charge
of 
and bury in cushion layer secretly
sideways. 
 
2)Adopt the
sinking type bathroom. Bathroom sink 350mm the
floor, hygiene 
utensil drain off water
and in charge of and bury on sinking space
secretly sideways 
 
 
 
 
Two
method 
these 
can
realize 
water
drainage 
of
bathroom 
prop 
up
and 
in 
charge of
earths surface to bury underground this one
without entering the neighbor 
family
sideways. 
Bury pipeline when
installing, 
construction quality must
check on 
strictly, can
construct bathroom ground after confirming
qualified secretly, So as not 
2 
to leave the hidden danger
in giving in the future using. Bathroom ground
construct 
and 
can
pack 
coal 
ash
light 
quality
material 
, 
also
can 
adopt 
and
lay 
bricks
impracticable to lay plate making
construct ground, Ground must make waterproof to
deal with, method can waterproof to
deal with according to roofing, make two oil one
rubber and plastic ointment waterproof
cloth. 
 
 
 
 
 
3)
water gauge the open air set up problem The water
gauge is had indoors, not 
only the work
load of checking meter is very heavy , but also
make the security and 
privacy of the
house reduce greatly . So house divide into
households of water gauge 
or divide
households of figure of water gauge Show that
should be set up in the open 
air.
Skyscraper 
water
gauge 
the 
open
air 
set 
up
following 
several
kinds 
of 
forms:
Whether  far it pass by water gauge
Change the ordinary water gauge into and
pass the water gauge far, is joined the
water gauge and data gathering machine by a
signal 
line, 
And
then 
reach
intelligence 
to
manage( 
the
computer). 
Its
merit 
lies 
in
saving a large amount of people
Strength comes to check meter, the data are
accurate, 
the shortcoming is that the
fabrication cost is high. Whether  magnetic stripe
card of by water gauge Users buy the
electronic card of the running water Company
in advance , then insert 
it
in the storing device of the water gauge, Card
amount of 
money deduct automatically on
the water, this way user need to prepay the water
rate, 
The price of the water gauge is
relatively high. 
 
 
3. adopt it set up at the
open air water gauge not ordinary 
1)The water gauge is set up in the
stair have a rest in the alcove of the platform.
Household watersupply to prop up and
manage and enter the kitchen, bathroom after
the 
water 
gauge
is 
measured. 
Way
this 
realize
water 
gauge
produce 
room 
set
up, 
equivalence low project
have , supply water and set up and in charge of
and set up 
with water gauge office
results in aesthetic problems in stair. It
suitable for the South 
warm district
kitchen, bathroom assign close to the houses of
positions of staircase. 
2)The water gauge concentrates on being
set up among the water gauges( meter
box). 
Person 
who
give 
when
supplying 
water,
set 
up 
water
gauge 
in 
ground
floor( meter box) on falling, every
household watersupply to prop up and is in charge
of 
applying
having 
in 
the
pipeline 
well,
Southern 
area 
can
overcast 
horn
place 
lay 
along
the outer wall in building too; Person who give
when supplying water, can set 
up water
gauge in roof( meter box) under upgoing. This way
increases and supplies 
water to prop up
In charge of and lay length, pipeline lay and
influence building to be 
beautiful
along outer wall. Water gauge produce way choice
that family assign, must 
combine house
kitchen, bathroom plane assign characteristic and
concrete request of 
developer, Carry on
to several feasibility scheme the above economic
technology fix 
after comparing.
Property well-managed medium-to-high grade
commodity apartment 
of housing
district, can adopt and pass the water gauge far ,
It is that the water gauge 
will use the
developing direction in the future; Estate
management perfect medium- 
to-high
grade 
commodity
apartment 
of
housing 
district,
can 
adopt
magnetic 
stripe
card water gauge( Company have this
kind district of business can design in running
water) Or concentrate on setting up it
among the water gauges( case); Southern area
unit type house can set up rest
platform office in stair with ordinary water
gauge, In 
order to reduce the
fabrication cost. 
 
3 
 
 
4)
establishment 
question
of 
the 
pot-type
boiler 
Should
reserve 
and
install 
hot 
water
supply terms of facility, set up hot water supply
facilities with when the design 
of
house. 
Have 
and
concentrate 
house
that 
hot 
water
supply 
on 
,
should 
consider
house assign with installation position
and cold hot water pipeline of hot water device.
The pot-type boiler generally has three
kinds, such as gas, electricity, solar
energy,etc.. 
Whether 
last
kitchen 
gas
heater 
and
electric 
heater
or 
Bathroom
inside, 
give 
when
draining 
off
water 
design
shoulding 
reserve
installation 
position
and 
cold 
hot
water 
interface of pipeline
of water heater in advance in building, Install by
oneself when 
convenient users fit up.
Solar energy and hot water It is simple and
convenient and 
safe for device to use,
need fuel and electric power is low to run the
expenses, Have 
long performance life,
pollution-free, received by the masses of users
favourably very 
much, Many houses have
been small in recent 
years The district
all install the solar 
water heater at
the time of designing and construct. Solar water
heater install and at 
the roof, need to
set up the cold hot water pipeline among bathroom
and water heater 
of the roofing like
this generally, Consider installation of solar
water heater when the 
design of house,
household can only lay cold and hot pipeline along
the building outer 
wall 
when
installing 
in 
the
future, 
Increase
household 
degree
of 
difficulty
when 
installing
like 
this 
,
increase 
pipeline
make 
the
investment, 
influence
building 
beautiful. Give
when draining off water the design needing to
solicit the developers 
suggestion
first 
in
building, 
Interconnected
system 
one
design, 
construct
the 
solar 
water
heater 
in 
unison;
Reserve 
solar
water 
heater 
and
cold 
hot 
water
installation 
position of
pipeline in 
advance only. The cold hot
water pipeline of the solar water
heater can be laid In the pipeline
well; Set up pipeline house of well , can set up
one 
UPVC 
drain
pipe 
of 
de110
as 
solar 
water
heater 
hot 
water
sleeve 
pipe 
of
pipeline 
close to corner of
person who take a shower in bathroom, Set up a
de110 *75 three 
direct links in each
hygiene interval ground, as connecting the entry
of cold and hot 
water pipe 
 
 
( 
5)
air 
conditioner
condensation 
ink
discharge 
the
issue 
In 
recent
years, 
air
conditioner enter huge numbers of
families gradually, condensation water amorphous
to discharge the building outer wall of
pollution air conditioner have, Have influenced
a 
beautiful
important 
problem
of 
biotope
already. 
Building
give 
when
draining 
off
water 
design
shoulding 
consider
air 
conditioner
condensation 
ink
discharge 
in 
a
organized 
way.
Concrete 
method
can 
machine 
set
up 
the 
water
drain 
pipe 
of
the 
condensation by the
position outside reserving air conditioner, Drain
off water and set 
up and in charge of
and select PVC-U drain pipe de40 for use , reserve
three direct 
links 
of
draining 
off
water 
highly 
in
each 
air
conditioner, 
It
is 
convenient 
for
air 
conditioner to drain off
water hose insert directly. 
译文来源:美国
PE
杂志建筑给排水工程师
2010
年第
10
期
 
4