8 Forms of Wastes In Lean Thinking
1.1 Definition the waste
In the supply chain, any
link that does not add value to the customer is a
waste.
Waste only adds to time and
cost.
1.2
8 forms
in manufacturing
Type of
waste
What is it?
Examples
?
Information sent automatically even
when not required
? Printing
documents before they are
required
?
work in process to balance
the
capacity
Remark
Over-
production
Produce more than the
planning demands,
Defects
Errors, mistakes
and rework
?
the
quality can
’
t meet the
customer
’
s
requirement;
?
the goods be reworked for its defects
?
scraped
products
Inventory
?
products manufactured before
demands;
Holding inventory
(material
?
purchase more
then demand every
and information) more
than
time for reduce the purchasing
cost;
required
?
material and tools purchased before
demand;
Over-
Processing
?
do more then the
customer
’
s quality
requirement, such as apply the higher
precision machine manufacture the
products;
?
do
more support thing then the quality
need, such as design more tools to
Processing more than
ensure
the quality then need;
required where
in a simple
? Follow
-ups and
costs associated with
approach would have done
coordination
? Too many
approvals
?
too
much needn
’
t paperwork, such
as
different forms reports for the same
thing; report to the person he
needn
’
t
know;
?
all the material flow from
the supplier
to the customer;
?
flow back in the
transport;
? M
ultiple hand-
offs
?
transport more
frequent between the
different
locations;
All the movements in the
Transportation
manufacture
and transport
to the customer
Waiting
?
Customers waiting to be served by a
contact center
? Queue
before the production;
Employees and customers
?
for the capacity in different process
waiting ,the equipments
links, waiting for the bottleneck
also;
working;
?
operators, even the whole
line waiting
to wok for some machine
break down
?
The equipments
waiting running;
Motion
?
needn
’
t parts
and body movement;
?
the
motions don
’
t balance
between
Movement of operator that
right and left;
does not add value
?
the information transfer in incorrect
form, to reduce the
eyes
’
workloads
the information can be transfer by
ears;
? Limited authority and
responsibi
lity
? Managers
common
? Person put on a
wrong job
?
make
the bad production planning
lead to
many waste happen;
?
employees not leveraged to their own
potential
management
The waste occur for the
sad
management
1.3 The summery
-
-
-
-
-
-
-
-
-